The cpm chamber ring deep double step srb4 delivers robust precast concrete construction engineered for below-ground water management applications. Designed for foul and surface water access, this deep chamber ring provides reliable performance across drainage and stormwater systems. The tongue and groove joint design enables quick, seamless installation while maintaining structural integrity. Three integrated 50mm lifting holes facilitate safe handling and precise positioning during deployment. Manufactured to bs en 1917:2002 bs 5911-3:2010 standards, this chamber ring also functions as a soakaway unit for natural ground infiltration. Compatible with standard and special access cover slabs for varied project requirements. Features & benefits: precast concrete construction for long-term durability in demanding below-ground environments. Tongue and groove joints ensure quick installation and secure connection between components. Functions as soakaway unit promoting natural water infiltration into ground. Three 50mm lifting holes for safe handling and installation positioning. Compatible with standard and special access cover slabs for varied access requirements. Suitable for foul water management, surface water drainage, stormwater systems, and soakaway installations requiring reliable below-ground access. Compliant with bs en 1917:2002 bs 5911-3:2010 standards. Dimensions: 1050 x 250mm.
Brand: CPM
Shipping Cost: DKK 25.00