Aqua channel rodding eye in channel is recommended to be installed for every 10 linear metre run of aqua channel to allow periodic cleaning of the drainage system.
Aqua channel rodding eye in channel is recommended to be installed for every 10 linear metre run of aqua channel to allow periodic cleaning of