The cpm chamber ring deep double step srb4 delivers robust precast concrete construction for below-ground water management applications. Engineered for both foul and surface water access, this deep chamber ring provides reliable performance across drainage and stormwater systems. The tongue and groove joint design enables rapid, secure installation while maintaining structural integrity. Three integrated 50mm lifting holes facilitate safe handling and precise positioning during placement. This chamber ring is also suitable for deployment as a soakaway unit, supporting natural infiltration in appropriate ground conditions. Manufactured to bs en 1917:2002 bs 5911-3:2010 standards, the unit is compatible with both standard and special access cover slabs. The precast concrete construction ensures long-term durability in demanding underground environments. Features & benefits: provides access for foul and surface water management systems in residential, commercial and infrastructure projects. Functions as a soakaway unit supporting natural ground infiltration. Tongue and groove joints ensure quick and secure installation with enhanced structural stability. Three 50mm lifting holes for safe handling and positioning during installation. Compatible with standard and special access cover slabs for varied access requirements. Precast concrete construction delivering durable, long-term performance in underground environments. Compliant with bs en 1917:2002 bs 5911-3:2010 industry st...
Brand: CPM
Shipping Cost: DKK 25.00
The cpm chamber ring deep double step srb4 delivers robust precast concrete construction for below-ground water management applications. Engineered for both foul and surface water